COVID 19 Restart Works

The Multi-Ministry Taskforce announced on 19 May 2020 that the Circuit Breaker measures
will gradually ease from 2 June 2020. Construction work will also be allowed to resume in phases but in a safe and controlled manner to minimize the risk of a COVID-19 resurgence.

The following documents regarding Covid Restart works;

ADVISORY FOR A SAFE AND CONTROLLED RESTART OF THE CONSTRUCTION SECTOR
FROM 2 JUNE 2020

Download | Chinese (中文)

COVID-SAFE WORKSITE CRITERIA

Download | Chinese (中文)

FAQS FOR A SAFE AND CONTROLLED RESTART OF THE CONSTRUCTION
SECTOR FROM 2 JUNE 2020

Download | Chinese (中文)

Share:

More Posts

Smoking Detection

Smoking Detection

AI video analytics is revolutionizing smoking detection, enhancing safety and compliance in various settings. By leveraging advanced algorithms, surveillance systems can autonomously identify smoking behavior