BCA mandates a Biometric Authentication System and monthly Construction Productivity Data for every Singapore project at or above 5,000 m² GFA. Collie turns every clock-in into an ePSS-ready manday, no more retyping site attendance into a spreadsheet.

check_circleReg 10, Buildability & Productivity Regs 2011
check_circleSGBuildex integration-ready
Collie Biometric Access Authentication Terminal - ZKTeco TS2011
5,000 m²
GFA statutory threshold

GFA threshold that triggers BAS & ePSS

1 May 2026
SGBuildex Enforcement

Automated CPD via SGBuildex becomes mandatory

gavelWhy it matters

Reg 10 doesn’t leave room for guesswork

Under Reg 10 of the Building Control (Buildability and Productivity) Regulations 2011, any project at 5,000 m² GFA or more must install a BAS and submit manpower data monthly, from the first Permit to Work through to TOP or CSC.

View Regulation 10 (SSO) open_in_new
priority_high

One missed month is a flagged record

BCA sends a reminder the moment a month’s submission is missing, then audits builders’ own declarations against BAS data.

warningAutomated Audit Flagging
table_chart_view

Manual re-entry is where mandays go wrong

Copying biometric logs into the ePSS Excel template by hand is exactly where trades get misclassified and hours mistallied.

sync_problemZero Spreadsheet Miscalculation
upgrade

SGBuildex is raising the bar

From 1 May 2026, new applicable projects move onto automated submission. A BAS that can’t integrate today means a forced upgrade later.

cloud_doneFuture-Proof Cloud Architecture
inventory_2What’s inside

From gate tap to ePSS-ready file

Every clock-in becomes a manday. Every manday rolls up into the exact report structure ePSS expects, onsite and offsite alike.

Request Hardware Specs download
badge 10 WORKERS / MIN

BCA-compliant BAS hardware

Face, fingerprint or card readers at every entrance and exit, built to clear 10 workers a minute per lane, with backup battery so a power cut never breaks the record.

10/min
Throughput
IP65
Ruggedized
Battery
Continuous Hold
account_tree AUTOMATIC CONVERSION

Automatic manday & trade classification

Register a worker once against a trade, and every hour clocked rolls up automatically, including the 12-hour-shift-equals-1.5-manday conversion BCA’s formula requires.

1.0 Manday
8h Standard Shift
1.5 Mandays
12h OT Shift
Trade Rules
BCA Aligned
domain_add OFFSITE INTEGRATION

Onsite & offsite manpower, one system

Import your prefab, PPVC or MEP supplier’s offsite manday returns alongside onsite clock-ins, one monthly file covers both.

Integrated Yard Formats: Prefab · PPVC · MEP Precast
file_export NATIVE TEMPLATE

Ready-to-upload ePSS Report

Pick the Month & Year from Transaction → Print, and export the ePSS Report as PDF or XLSX, already laid out the way ePSS expects it.

Export Formats: PDF · XLSX (Official ePSS Format)
How it flows

Four clicks, from clock-in to export

Straight from the Collie dashboard, no separate tool, no re-keying.

01 STEP ONE

Open Transaction

Log in to Collie and go to Transaction on the left-side menu, then click Print.

02 STEP TWO

Pick the report

Choose Breakdown, Summarized, First Check-In/Last Check-Out, or the ePSS Report.

03 STEP THREE

Set the period

Start/End Date for attendance reports, or just Month & Year for the ePSS Report.

04 STEP FOUR

Export

Click Export Report as PDF for sharing or XLSX for further processing.

Reports at a glance

One Transaction menu, four report types

Every report pulls from the same attendance data, pick the level of detail you need, export as PDF or XLSX.

01Detail

Breakdown of Manpower Report

Every individual Check-In and Check-Out transaction, for when you need to review detailed attendance rather than a summary.

02Rollup

Summarized Manpower Report

Total working days and working hours per person over the period, a rollup, not a transaction log.

03Daily Timestamps

First Check-In / Last Check-Out Report

The first entry and last exit recorded for each person, each day, the daily attendance start and end time at a glance.

Compliance
04Statutory

ePSS Report

Manpower data already laid out in the format BCA’s ePSS monthly submission expects, select Month & Year, export, upload.

Where it’s deployed

Wherever BCA’s 5,000 m² threshold applies

From residential projects to civil works across Singapore, Collie’s BAS architecture scales effortlessly.

01

Residential & Mixed Developments

Public and private housing where GFA, once basement carpark and roof area are added into CFA, crosses the threshold.

02

Commercial & Office Towers

New builds and major A&A works at or above 5,000 m² GFA, submitted for planning permission from 1 Nov 2014 onward.

03

Institutional & Healthcare

Hospitals, schools and campuses where several contractors and offsite suppliers need one consolidated manday record.

04

Rail, Road & Tunnel Works

Projects measured by Total Constructed Area rather than Total Floor Area, under the same monthly submission obligation.

helpFAQ

Frequently asked questions

Everything Singapore builders, project directors, and site admins need to know about BCA Regulation 10 compliance.

Any project where new GFA, reconstructed floor area, or the GFA increase from building works totals 5,000 m² or more, aside from a short exemption list covering bridges, tunnels, places of worship, power stations and waste treatment plants.

One manday is one worker on site for 8 hours; a 12-hour shift logs as 1.5 mandays, the exact conversion Collie’s BAS applies to every clock-in automatically.

Yes. Our terminals meet BCA’s hardware and software requirements, entrance/exit clearance of 10 workers a minute, tamper-resistant real-time logging, backup power, and output in the Excel format ePSS accepts, so the report is ready to upload, not retyped.

Monthly submission runs from the first Permit to Work up to the month the project obtains full TOP or CSC. Collie’s dashboard flags this milestone automatically.

Yes, as more work shifts to DfMA and prefabrication, BCA requires offsite manday data too. Collie imports your offsite suppliers’ returns into the same monthly file as onsite clock-ins.

Our roadmap follows BCA’s integration path for automated CPD submission, so projects onboarding before the 1 May 2026 mandatory date can start on Collie without a later hardware swap.

security_update_good Guaranteed BCA Reg 10 Compliance

Stop retyping ePSS manually

Tell us your project’s GFA, gate count, and current BAS setup, we’ll show you exactly what compliant, ePSS-ready manpower tracking looks like on your site.

Talk to a Collie Compliance Specialist

Click below to share your project details. A specialist will reach out within 2 hours during business hours.

Tell Us Your Needs arrow_forward